S 7813
line S2 · DB Regio AG S-Bahn Stuttgart
On time
+4′
Expected arrival
09:45 · Platform 2
In transit between Fellbach and Stuttgart-Sommerrain (Position estimated from timetable and delays; no current GPS fix. Check the age of the last report)source 08:59
Last report: Rommelshausen at 08:57 (6 min ago)+6 min
Why is it late?
- Delay of a preceding train
Reason reported by Deutsche Bahn, translated into English
Timetable and forecasts: gtfs.de (CC BY-SA 4.0) · Real time: DB HAFAS
Delay history
Daily stored live forecasts. Not confirmed arrivals.
On time
68%
Avg delay
+5.3 min
Max delay
+180 min
Runs
1618
Figures from 1,612 arrivals; on time means at most 5 min late · 6 runs without a reliable arrival forecast left out